P.R.No.462
Tamil Nadu promise ledger
P.R.No.462·29 Jul 2026·governance
CM Joseph Vijay inspects Chennai Metro Phase-I and Phase-II works, takes driverless train trial ride
Chief Minister Thiru. C. Joseph Vijay inspected Chennai Metro Rail Phase-I and Phase-II construction progress on 29.07.2026, travelling by metro from Government Estate to Nandanam station and visiting the Operation Control Centre at the "Metros" building to review train operations and last-mile connectivity. He then inspected elevated "Balanced Cantilever" construction work on Corridor-5 of Phase-II between Madhavaram and Sholinganallur, visited the Porur Bypass and Poonamallee Bypass metro stations on Corridor-4, and took a trial ride on a driverless Unattended Train Operation (UTO) metro rake. Finance Minister N. Marie Wilson, MLAs M. Harish and P. Rhevanth Charan, Chief Secretary Mu. Sai Kumar and CMRL Managing Director M.A. Siddiq were present.
Linked Person
JO
Joseph Vijay Thiru. C.
Chief Minister
Content built by: AI Translated
Press Release Content
Press Release
Hon'ble Chief Minister of Tamil Nadu Thiru. C. Joseph Vijay inspects Chennai Metro Rail stations
The Hon'ble Chief Minister of Tamil Nadu personally inspected works relating to Phase-I and Phase-II of the Chennai Metro Rail project. During the visit, the functioning of the Operation Control Centre at the metro stations, and improvements to Last Mile Connectivity facilities, were reviewed.
The Hon'ble Chief Minister inspected ongoing construction works at stations under Phase-I and Phase-II, including bridge works using the Balanced Cantilever method, and directed officials to complete the works within the stipulated timeframe.
The Unattended Train Operation (UTO) technology to be deployed at stations under Phase-II was also explained during the visit.
Hon'ble Ministers, the Managing Director of Chennai Metro Rail Limited, and senior officials accompanied the Chief Minister during the inspection.
[Note: The source OCR transcription of this press release was severely degraded; additional statistics related to the inspection and the complete list of participating officials could not be reliably reconstructed and have been omitted from this summary.]
Issued by: Director, Directorate of Information and Public Relations, Chennai-9
Issued By: Directorate of Information and Public Relations (DIPR), Chennai
Tags